Products

Search

Request a quote

Request a quote

Contact us

Phone: (+61 8) 9475 0700
Fax: (+61 8) 9475 0770
Mobile: (+61) 400 346 687
Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.

High Pressure Abandonment Packers

High pressure flowing boreholes can pose a significant problem when it comes to abandonment procedures. RIPE has recently and successfully capped multiple wells flowing at over 37 litres/ second by using our high pressure grout packers. A TAM cover was specially developed to protect the valve because of issues with the flowing borehole forcing the TAM valve to fold on itself. Drill rods were used for deployment to provide a push down force and stabilisation so the packers could be installed correctly before inflation. A shear pin mechanism installed on the packers made for easy and quick abandonment.